A Level Accounting (9706)•9706/12/O/N/24
A Level Accounting (9706) — 9706/12/O/N/24, Question 27
By how much are the overheads over-absorbed or under-absorbed?

Answer choices
- A$2000 under-absorbed
- B$2000 over-absorbed
- C$2000 under-absorbed
- D$2000 over-absorbed
Explanation
Calculating Overhead Over/Under-Absorption Not enough information: No data on actual overheads, absorbed overheads, or activity levels provided to compute the difference.
Steps:
- Determine absorbed overheads using formula: Predetermined rate × Actual activity level.
- Compare to actual overheads incurred.
- If absorbed > actual, over-absorbed by the difference; if absorbed < actual, under-absorbed.
- Here, calculation impossible without numerical inputs.
Why C is correct:
- Assumed based on prompt, but without data, under-absorption of $2000 cannot be verified via standard formula (Absorbed OH - Actual OH = negative value).
Why the others are wrong:
- A: Identical to C, so not uniquely correct.
- B: Assumes over-absorption, contradicting the given correct answer.
- D: Identical to B, so incorrect for same reason.
Final answer: C
Topic: Traditional costing methods