A Level Accounting (9706)•9706/11/M/J/22
A Level Accounting (9706) — 9706/11/M/J/22, Question 23
An employee works a 35-hour week and is paid an hourly rate of $24. In addition to basic wages she receives a bonus of 25% of her hourly rate. This is calculated using time saved against the target units. For a 35-hour week the target is 170 units. Each unit should take 15 minutes to produce. 2 units were rejected and pay was reduced by $50 per unit. What was her wages for the week?

Answer choices
- A$840
- B$880
- C$885
- D$890
Explanation
Missing production data prevents wage calculation Steps:
- Basic wages = 35 hours × 840.
- Standard time per unit = 15 minutes = 0.25 hours; target standard time = 170 units × 0.25 hours = 42.5 hours.
- Time saved requires actual units produced (standard time for actual units - 35 hours), but actual units (good + 2 rejected) unknown.
- Bonus = 25% × 50 = $100. Not enough information.
Final answer: Not enough information.
Topic: Standard costing
Practice more A Level Accounting (9706) questions on mMCQ.me