A Level Accounting (9706)•9706/12/M/J/20
A Level Accounting (9706) — 9706/12/M/J/20, Question 30
A company has recently introduced a system of budgetary control. Workers have given the following reasons for failing to achieve the budget targets. 1 'We need more training.' 2 The budget is unrealistic. 3 The budget needs to be changed to reflect actual conditions. Which reasons should be considered when evaluating a worker's performance?

Answer choices
- A1,2 and 3
- B2 and 3 only
- C2 only
- D3 only
Explanation
Evaluating Performance in Budgetary Control
Steps:
- Identify reasons affecting budget achievement: training needs, budget realism, and adaptability to conditions.
- Assess reason 1: Lack of training directly impairs worker capability to meet targets.
- Assess reason 2: Unrealistic budgets distort performance measurement validity.
- Assess reason 3: Failure to update budgets for actual conditions unfairly penalizes workers.
- Conclude all reasons warrant consideration for fair evaluation.
Why A is correct:
- In budgetary control systems, performance evaluation requires considering all controllable and uncontrollable factors (per standard variance analysis principles) to ensure equitable assessment.
Why the others are wrong:
- B: Excludes training, ignoring a key factor in worker preparedness.
- C: Omits adaptability and training, leading to incomplete evaluation.
- D: Ignores unrealistic budgets and training, focusing too narrowly on adjustments.
Final answer: A
Topic: Budgeting and budgetary control