A Level Accounting (9706)•9706/11/M/J/18
A Level Accounting (9706) — 9706/11/M/J/18, Question 22
A business employs 20 production staff. Each worker is employed for 40 hours per week at a rate of $50 per hour. Piece rate is calculated at 20% of basic rate pay per hour for each product manufactured above 120 units. In a week, each employee produced 145 units. What were the total wages for the week?

Answer choices
- A$7020
- B$6984
- C$10784
- D$10920
Explanation
Piece rate wages require clarifying the bonus per excess unit Steps:
- Basic pay per worker: 40 hours × 2,000; for 20 workers = $40,000.
- Excess units per worker: 145 - 120 = 25; total excess = 20 × 25 = 500 units.
- Piece rate: 20% of 10, but ambiguous if $10 per unit, per hour equivalent, or prorated by time per unit (standard 40/120 = 1/3 hour/unit).
- Total wages = basic + piece bonus, but piece application unclear (e.g., 5,000 bonus, total $45,000; not in options).
Not enough information.
Final answer: Not enough information.
Topic: Costs and cost behaviour
Practice more A Level Accounting (9706) questions on mMCQ.me