O Levels/IGCSE Accounting (7707)•7707/12/M/J/20
O Levels/IGCSE Accounting (7707) — 7707/12/M/J/20, Question 27
A manufacturing business provided the following information.
Prime cost $
Factory overheads 236000
Opening work in progress 8000
Closing work in progress 6000
What is the factory cost of production?

Answer choices
- A$234000
- B$238000
- C$276000
- D$280000
Explanation
Factory cost requires prime cost value, which is missing
Steps:
- Identify key components: factory cost of production = prime cost + factory overheads + opening WIP - closing WIP.
- Note given values: factory overheads = 8,000; closing WIP = $6,000.
- Recognize prime cost lacks a numerical value in the provided information.
- Conclude calculation impossible without prime cost.
Not enough information.
Why D is correct:
- Cannot verify; prime cost value omitted, preventing formula application.
Why the others are wrong:
- A: Ignores overheads and WIP adjustments entirely.
- B: Adds net WIP change ($2,000) to overheads but excludes prime cost.
- C: Unclear derivation; does not align with standard formula without prime cost.
Final answer: Not enough information.
Topic: Manufacturing accounts
Practice more O Levels/IGCSE Accounting (7707) questions on mMCQ.me